top of page

PORTFOLIO

Selected Project Experience

Some projects cannot pause, cannot slip, and cannot be entrusted to just anyone. PrismPoint leads complex capital initiatives — guiding owners from initial concept through final closeout while adapting to the operational, regulatory, and delivery demands of each setting.

image.png

$70M+  Portfolio · Healthcare

Healthcare capital portfolio & master planning

Provided strategic leadership for a $70M+ healthcare capital portfolio across six hospitals, guiding complex renovation, expansion, greenfield, and infrastructure initiatives from concept through delivery while ensuring alignment with operational priorities, regulatory requirements, and organizational standards.

$55M  New construction · Research

Research & manufacturing building

Led planning and design development for a proposed 32,000-square-foot greenfield Type IIA research facility incorporating H-2 and H-3 hazardous-occupancy areas. Directed multidisciplinary coordination across mechanical, civil, structural, and process requirements, advanced long-lead equipment planning, and established the project’s commissioning and validation strategy before construction funding was deferred.

$18M  New construction

Free-standing emergency department

Ground-up build of a 12,500 sq ft emergency facility.

$3M  Renovation

Cath lab to EP lab conversion

Replaced major medical equipment, reconfigured the control room, and renovated the space.

$3M  Infrastructure · MEP/HVAC

Critical area chiller replacement

Designed and replaced an end-of-life chiller serving the cardiovascular operating rooms with an N+1 redundant system, adding desiccant dehumidification to hold seasonal humidity within compliance. Crane lifts executed safely with minimal impact to operations.

$2M  Renovation · Healthcare

MRI build out

Led planning and execution of an MRI suite renovation within a fully operational hospital — structural reinforcement for the MRI's load and magnetic impact, plus specialized HVAC, shielding, and zone-based phasing under strict infection-control and patient-safety protocols.

$80K  Renovation

Kitchen Renovations

Led phased upgrades within an active kitchen, including replacement of the wash sink and modification of plumbing shared with the second-floor suite, along with ceiling tiles, ventilation grilles, and cooler-area flooring. Coordinated construction around continuous operations to maintain uninterrupted meal service throughout the work.

$2M  Renovation · Healthcare

Cath lab to EP lab conversion

Led planning and execution of an MRI suite renovation within a fully operational hospital — structural reinforcement for the MRI's load and magnetic impact, plus specialized HVAC, shielding, and zone-based phasing under strict infection-control and patient-safety protocols.

U.S. Air Force 

Federal IDIQ · O&M

Multiple Air Force bases — Langley, Tinker & Vandenberg

Directed operations and maintenance across multiple Air Force bases under a federal IDIQ contract supporting NAVFAC and Army facilities. Implemented CMMS systems, executed energy-efficiency upgrades, and led major equipment replacements (boilers, chillers, AHUs, cooling towers) and renovations across DOD medical treatment facilities.

Womack Army Medical Center  Federal hospital · IDIQ

Fort Bragg, NC

Led federal hospital facilities management under an IDIQ contract — ensured Joint Commission (TJC) readiness, managed all IDIQ projects, and supervised a team of project managers; also directed maintenance and infrastructure readiness for Fort Stewart and Hunter Army Airfield.

U.S. Army 

Base operations support

Fort Stewart & Hunter Army Airfield, GA

Led base operations support (BOS) under a U.S. Army contract — oversaw facility maintenance operations, served as Site Safety and Health Officer (SSHO), and managed inspection programs to ensure compliance across mission-critical infrastructure.

Sheraton Birmingham / BJCC 

Renovation · Hospitality

Lobby & guest-interface modernization

Led the full redesign and modernization of the hotel lobby and guest-interface areas — contractor coordination, fire/life-safety system upgrades, and schedule management.

WOSB Certified.jpg
WOB_Certified_WBENC_color.jpg
bottom of page